This interior renovation converted a large meeting room into a chapel space with a new circulation and an adjacent reading and study area. The orientation and function of the room was changed with extensive lighting, material and finishes introduced with a minimum of actual wall and room changes. The new work is flexible and dramatically adaptable for the various sizes and needs of the groups using the facility.
Solomon-Schechter Day School
Newton, MA
Project Type
Educational Facility/K-12
Completion
1999